Skip to main content
Business people having meeting over blueprints

Water management reports

On this page you can download the various Stage 2 and 3 water monitoring and management plans, water management annual reports and the Surat North Development Water Resource Monitoring and Management Plan.

Northern Development Area GDE Management Plan

CDM Smith-QGC Northern Development Area GDE Management Plan

Surat North Development Water Resource Monitoring and Management Plan

1.0 Surat North Development CSG Water Monitoring and Management Plan

1.1 Appendix A EPBC approval 2013-7047 Surat Basin

1.2 Appendix B Aquifer Surveillance Methodology

1.3 Appendix C Jacobs Letter Peer Review WMMP Surat North

1.4 Appendix D Water Resource Characteristics of the Study Area

1.5 Appendix E Water Quality Parameters

1.6 Appendix F Evidentiary Standards

1.7 Appendix G Reference value and trend analysis Report

1.8 Appendix H Joint Industry Plan

1.9 Appendix I Water level review

1.10 Appendix J OGIA Summary Report

1.11 Appendix K Ground Motion Appendix 8D

1.12 Appendix L Ground Motion Appendix 8E

Annual Reports

QGC Water Management Plan: 2025 Annual Report

QGC Water Management Plan: 2024 Annual Report

QGC Water Management Plan: 2023 Annual Report

QGC Water Management Plan: 2022 Annual Report

QGC Water Management Plan: 2021 Annual Report

QGC Water Management Plan: 2020 Annual Report

QGC Water Management Plan: Annual Report 2019

QGC Water Management Plan: 2018 Annual Report

QGC Water Management Plans for approval: 2017 Annual Report

QGC Stage 3 Water Monitoring Management Plan: 2016 Annual Report

EPBC Referral 2008/4398 Approval Condition 49i: Annual Report – 2013

QGC Stage 3 Water Monitoring Management Plan: 2015 Annual Report

Stage 3 Water Monitoring and Management Plan

By chapter

Executive Summary

1.0 - Stage 3 CSG water monitoring and management plan

2.0 - Key achievements of the Stage 1 and Stage 2 WMMPs

3.0 - The acquisition of hydrogeological and related petroleum engineering data

4.0 - Quantitative analysis of monitoring data - trend analysis, baseline and threshold values

5.0 - The conceptual model of groundwater flow in the Surat Basin

6.0 - Numerical groundwater flow modelling - GEN3

7.0 - Connectivity of aquifers and aquitards

8.0 - Springs monitoring and management - the Joint Industry Plan

9.0 - A preliminary hydrochemistry model and isotope assessment

10.0 - Ground motion monitoring and management

11.0 - Well stimulation activities and the characterisation of stimulation fluids

12.0 - Groundwater management - reinjection and repressurisation options

13.0 - Groundwater management - response plans and actions

14.0 - Associated water management

15.0 - Brine and salt management

16.0 - Water management - Emergency discharge plans

17.0 - Reporting

Stage 2 Water Monitoring and Management Plan by chapter:

Executive Summary

1.0 - Stage 2 CSG water monitoring and management plan

2.0 - Key CSG water management Achievements to date

3.0 - Developing robust water Management tools

4.0 - Surat QCLNG bore baseline program status

5.0 - Establishing a Comprehensive Monitoring Network - Stage 2

6.0 - Quantifying aquifer connectivity

7.0 - Groundwater quality monitoring and hydrochemistry program

8.0 - Data management and interpretation

9.0 - Springs

10.0 - Ground motion monitoring and management plan

11.0 - Re-injection and repressurisation options

12.0 - Exceedance thresholds and determining response actions

13.0 - Well stimulation

14.0 - Ensuring responsible CSG water management and beneficial use

15.0 - Brine management and strategy

16.0 - Reporting

Stage 2 Appendices

Stage 3 Appendices

Stage 3 WMMP Commitments Table PDF (0.30 MB)

Appendix A - SEWPaC correspondence - conditions variation

Appendix A.1 - Letter notifying variation PDF

Appendix A.2 - Stage 2 WMMP approval and Stage 3 PDF

Appendix A.3 - Variation instrument PDF

Appendix A.4 - Variation to conditions PDF

Appendix B - OGIA groundwater flow model information

Appendix B.1 - Cover letter PDF

Appendix B.2 - Letter regarding model and springs PDF

Appendix B.3 - Letter regarding payment levy PDF

Appendix E.2 - Monitoring network implementation plan PDF

Appendix E.2.1 - Monitoring implementation table PDF

Appendix L - (Appendix 1) SEWPaC correspondence PDF

Appendix L - (Appendix 3.1) QGC Stage 1 baseline report summary PDF

Appendix P - Chinchilla Weir Beneficial Use Scheme

Appendix P - Approval notice PDF

Appendix R - Emergency response documents

Appendix S - Standards and relevant policies and guidelines PDF

Appendix T - 2014 Annual Report PDF

More in Environment

You may also be interested in