
Water management reports
On this page you can download the various Stage 2 and 3 water monitoring and management plans, water management annual reports and the Surat North Development Water Resource Monitoring and Management Plan.
Northern Development Area GDE Management Plan
Northern Development Area GDE Management Plan
Surat North Development Water Resource Monitoring and Management Plan
Surat North Development Water Resource Monitoring and Management Plan
1.0 Surat North Development CSG Water Monitoring and Management Plan
1.1 Appendix A EPBC approval 2013-7047 Surat Basin
1.2 Appendix B Aquifer Surveillance Methodology
1.3 Appendix C Jacobs Letter Peer Review WMMP Surat North
1.4 Appendix D Water Resource Characteristics of the Study Area
1.5 Appendix E Water Quality Parameters
1.6 Appendix F Evidentiary Standards
1.7 Appendix G Reference value and trend analysis Report
1.8 Appendix H Joint Industry Plan
1.9 Appendix I Water level review
1.10 Appendix J OGIA Summary Report
Annual Reports
Annual Reports
QGC Water Management Plan: 2025 Annual Report
QGC Water Management Plan: 2024 Annual Report
QGC Water Management Plan: 2023 Annual Report
QGC Water Management Plan: 2022 Annual Report
QGC Water Management Plan: 2021 Annual Report
QGC Water Management Plan: 2020 Annual Report
QGC Water Management Plan: Annual Report 2019
QGC Water Management Plan: 2018 Annual Report
QGC Water Management Plans for approval: 2017 Annual Report
QGC Stage 3 Water Monitoring Management Plan: 2016 Annual Report
EPBC Referral 2008/4398 Approval Condition 49i: Annual Report – 2013
QGC Stage 3 Water Monitoring Management Plan: 2015 Annual Report
Stage 3 Water Monitoring and Management Plan
Stage 3 Water Monitoring and Management Plan
By chapter
1.0 - Stage 3 CSG water monitoring and management plan
2.0 - Key achievements of the Stage 1 and Stage 2 WMMPs
3.0 - The acquisition of hydrogeological and related petroleum engineering data
4.0 - Quantitative analysis of monitoring data - trend analysis, baseline and threshold values
5.0 - The conceptual model of groundwater flow in the Surat Basin
6.0 - Numerical groundwater flow modelling - GEN3
7.0 - Connectivity of aquifers and aquitards
8.0 - Springs monitoring and management - the Joint Industry Plan
9.0 - A preliminary hydrochemistry model and isotope assessment
10.0 - Ground motion monitoring and management
11.0 - Well stimulation activities and the characterisation of stimulation fluids
12.0 - Groundwater management - reinjection and repressurisation options
13.0 - Groundwater management - response plans and actions
14.0 - Associated water management
15.0 - Brine and salt management
Stage 2 Water Monitoring and Management Plan by chapter:
Stage 2 Water Monitoring and Management Plan by chapter:
1.0 - Stage 2 CSG water monitoring and management plan
2.0 - Key CSG water management Achievements to date
3.0 - Developing robust water Management tools
4.0 - Surat QCLNG bore baseline program status
5.0 - Establishing a Comprehensive Monitoring Network - Stage 2
6.0 - Quantifying aquifer connectivity
7.0 - Groundwater quality monitoring and hydrochemistry program
8.0 - Data management and interpretation
10.0 - Ground motion monitoring and management plan
11.0 - Re-injection and repressurisation options
12.0 - Exceedance thresholds and determining response actions
14.0 - Ensuring responsible CSG water management and beneficial use
Stage 2 Appendices
Stage 2 Appendices
- Appendix A - Annual QCLNG CSG water production estimates PDF
- Appendix AA - Chinchilla Weir referral decision PDF
- Appendix B.1 - Approval conditions PDF
- Appendix B.2 B.3 - SEWPAC approval of QWC cumulative model and spring survey, and of subsidence techniques PDF
- Appendix BB - Significant Species Management Plan PDF
- Appendix C (1-5) - Water balance figures, GEN2 modelled drawdowns, groundwater quality maps, pilot production monitoring bores PDF
- Appendix CC - Brine management PDF
- Appendix D - Surat Basin geological model PDF
- Appendix E - Geological cross sections PDF
- Appendix F - Springbok Sandstone characterisation study PDF
- Appendix G.1 - Groundwater Monitoring Plan PDF
- Appendix G.2 - Surat Basin groundwater salinity data PDF
- Appendix H - Stage 1 groundwater monitoring bore construction PDF
- Appendix I - Stage 1 groundwater monitoring bore pumping tests PDF
- Appendix J - Groundwater level assessment--bore hydrographs PDF
- Appendix K - DEHP database preliminary assessment PDF
- Appendix L - Trend analysis methodology report PDF
- Appendix M - Aquitard Kv literature review PDF
- Appendix N - Walloon Coal Measures vertical permeability analysis PDF
- Appendix O - Vertical connectivity and geology review PDF
- Appendix P - Woleebee Creek bore GW1 Gubberamunda core analysis PDF
- Appendix Q - Proposed EPBC Springs monitoring scheme PDF
- Appendix R - Subsidence modelling study PDF
- Appendix S - Altamira preliminary baseline program figure PDF
- Appendix T (1,2) - Site Emergency Response Plan -- Kenya, Dam Safety Emergency Response Plan PDF
- Appendix U - Draft Exceedance Response Plan PDF
- Appendix V - Modelled Groundwater Hydrographics for Proposed Spring Monitoring Points PDF
- Appendix W.1 - Fraccing Chemicals Assessment PDF
- Appendix W.2 - Fraccing Chemicals Assessment--Risk Assessment Addendum Report--Sodium Erythorbate PDF
- Appendix W.3 - Fraccing Chemicals Assessment--Risk Assessment Addendum Report--Sodium Thiosulphate PDF
- Appendix W.4 - Fraccing Chemicals Assessment--Risk Assessment Addendum Report--Citiric Acid and Gelatin PDF
- Appendix W.5 - Fraccing Chemicals Assessment--Risk Assessment Addendum Report--GLFC5 PDF
- Appendix W.6 - Fraccing Chemicals Assessment--Risk Assessment Addendum Report--J494, L064 and M275 PDF
- Appendix X.1 - Kenya and Windibri Receiving Environment Monitoring Plan PDF
- Appendix X.2 - Assessment of Flow Impacts on Narran Lakes PDF
- Appendix X.3 - Wieambilla Creek Assessment for MNES PDF
- Appendix X.4 - Wieambilla Creek Aquatic Values PDF
- Appendix X.5 - Chinchilla Weir Environmental Assessments PDF
- Appendix X.6 - Queensland Government CSG Water Management Policy PDF
- Appendix X.7 - Chinchilla Weir Referral Decision PDF
- Appendix X.8 - Glebe Weir Referral Decision PDF
- Appendix Y - Individual Pond Operation Plan (Orana 5 Pond) PDF
- Appendix Z - Wieambilla Creek aquatic values assessment and discharge locations constraint report PDF
- Compendium of Figures PDF
Stage 3 Appendices
Stage 3 Appendices
Stage 3 WMMP Commitments Table PDF (0.30 MB)
Appendix A - SEWPaC correspondence - conditions variation
Appendix A.1 - Letter notifying variation PDF
Appendix A.2 - Stage 2 WMMP approval and Stage 3 PDF
Appendix A.3 - Variation instrument PDF
Appendix A.4 - Variation to conditions PDF
Appendix B - OGIA groundwater flow model information
Appendix B.1 - Cover letter PDF
Appendix B.2 - Letter regarding model and springs PDF
Appendix B.3 - Letter regarding payment levy PDF
Appendix E.2 - Monitoring network implementation plan PDF
Appendix E.2.1 - Monitoring implementation table PDF
Appendix L - (Appendix 1) SEWPaC correspondence PDF
Appendix L - (Appendix 3.1) QGC Stage 1 baseline report summary PDF
Appendix P - Chinchilla Weir Beneficial Use Scheme
Appendix P - Approval notice PDF
Appendix R - Emergency response documents
Appendix S - Standards and relevant policies and guidelines PDF




