Management plans
Government, both Federal and Queensland have issued QGC with a range of environmental permits and approvals. The conditions that allow QGC to operate are stringent and require the business to develop a wide range of Management Plans.
Gasfields
-
Cumulative Impact Assessment Review
Cumulative Impact Assessment Review
This report has been prepared to directly address the relevant parts of Condition 80 of EPBC Approval 2008/4398 for the QCLNG project.
-
Constraints Planning and Field Development Protocol
Constraints Planning and Field Development Protocol
Constraints Planning and Field Development Protocol- The Revised plan was approved on 13 July 2017 and fulfils condition 3 of EPBC Approval 2015/7463 and conditions 3 to 6 of EPBC Approval 2008/4398.
-
QCLNG Gas Field Significant Species Management Plan
A revised Gas Fields Significant Species Management Plan was approved on 22 December 2015 and fulfils the requirements of Conditions 7-10 of EPBC Approval 2008/4398.
Pipeline
-
Common Systems Environmental Operating Procedure
Common Systems Environmental Operating Procedure
The Environmental Operating Procedure was approved by the Department of Agriculture, Water and the Environment (formally DoE) on the 28 May 2020 and fulfills the requirements of conditions 3 and 29 of the EPBC Approval 2008/4399.
-
Significant Species Management QCLNG Export Pipeline - Narrows Crossing
Significant Species Management Plan Narrows Crossing
This Management Plan was approved by Department of the Environment (formally SEWPaC) on 19 October 2011 and fulfils the requirements of Conditions 2, 4, 8, 9, 10, 11,12,13 of EPBC Approval 2008/4399
-
Translocation and Management Plan for Cycas Megacarpa
Translocation and Management Plan for Cycas Megacarpa
The revised Cycas megacarpa Translocation and Management Plan was approved on 19 August 2016 and fulfils the requirements of conditions 24 to 27 of EPBC 2008/4399 approvals.
-
Export Pipeline The Narrows Crossing Aquatic Values Management Plan
Export Pipeline The Narrows Crossing Aquatic Values Management Plan
This plan was approved by Department of the Environment (formally SEWPaC) on 30 September 2011 and fulfils the requirements of Conditions 35-38 of EPBC Approval 2008/4399
-
Acid Sulfate Soils Environmental Management Plan
Acid Sulfate Soils Environmental Management Plan
This plan was approved by Department of the Environment (formally SEWPaC) on 26 July 2013 and fulfils the requirements of Conditions 29(a) and 30 of EPBC Approval 2008/4399
-
Pipeline Aquatic Values Management Plan
Pipeline Aquatic Values Management Plan
This plan was approved by Department of the Environment (formally SEWPaC) on 30 September2013 and fulfils the requirements of Conditions 35-38 of EPBC Approval 2008/4399
-
Pipeline Significant Species Management Plan
This Management Plan was approved by SEWPAC on 30 August 2013 and fulfils the requirements of Condition 2 of EPBC Approval 2008/4399.
-
Dredge Management Plan
This Management plan was approved by Department of the Environment (formally SEWPaC) on 7 August 2012 and fulfils the requirements of Conditions 31, 32 and 33 of EPBC Approval 2008/4399
LNG plant
-
QCLNG Monte Christo Offset Proposal Plan
QCLNG Monte Christo Offset Proposal Plan
The Monte Christo Offset Proposal Plan was approved by the Department of the Environment on 27 September 2013 and fulfils QGC's offset obligations under EPBC Approvals 2008/4402 and 2008/4399.
Construction Environmental Control Plan
This Plan was approved by Department of the Environment (formally SEWPaC) on 13 January 2011 and fulfils the requirements of Conditions 23-25 of EPBC Approval 2008/4402.
- Construction Environmental Control Plan - Part 1
- Construction Environmental Control Plan - Part 2
- Construction Environmental Control Plan - Part 3
- Construction Environmental Control Plan - Part 4
- Construction Environmental Control Plan - Part 5
- Construction Environmental Control Plan - Part 6
- Construction Environmental Control Plan - Part 7
- Construction Environmental Control Plan - Part 8
- Construction Environmental Control Plan - Part 9
- Construction Environmental Control Plan - Part 10
- Construction Environmental Control Plan - Part 11
- Construction Environmental Control Plan - Part 12
- Construction Environmental Control Plan - Part 13
- Construction Environmental Control Plan - Part 14
- Construction Environmental Control Plan - Part 15
- Framework Construction Environmental Management Plan - Curtis Island
This Management Plan was approved by SEWPaC on 13 January 2011 and fulfils the requirements of Conditions 23-25 of EPBC Approval 2008/4402.
-
Species Management Program for LNG Facility Construction Phase
Species Management Program for LNG Facility Construction Phase
This Management Plan was approved by DERM on 30 September 2010 and fulfils the requirement of section 332 (4)(a) of the Nature Conservation (Wildlife Management) Regulation 2006. The plan applies to the construction phase of the project.
-
LNG Facility Code of Conduct
This code of Conduct including the implementation strategy was approved by Department of the Environment (formally SEWPaC) on 19 January 2011 and fulfils the requirements of conditions 3-9 of EPBC Approval 2008/4402.
-
Midstream Environmental Operating Procedure
This Midstream Environmental Operating Procedure was approved by the Department of the Environment and Energy on 17 January 2019 and fulfils the requirements of Conditions 26 and 27 of the EPBC Approval 2008/4402.
-
Commissioning Environmental Management Plan
Commissioning Environmental Management Plan
This Management Plan was approved by the DoE on 13 December 2013 and fulfils the requirements of Conditions 23 and 24 of EPBC Approval 2008/4402.
-
Long-Term Turtle Management Plan: LNG Facilities - Curtis Island, Gladstone
QCLNG-BX00-ENV-PLN-000070 Long Term Turtle Management Plan_Rev 5
20200324 Joint DAWE Approval for Long-Term Turtle Management Plan Rev 5
This Long-Term Turtle Management Plan (Rev 5) was approved by the Department of Agriculture, Water and the Environment (DAWE) on 24 March 2020 in accordance with condition 45 of EPBC 2008/4402 and fulfils the requirements of Conditions 34-39 of EPBC 2008/4402.
Marine facilities
-
Marine Facilities Construction Management Plan
Marine Facilities Construction Management Plan
This Management Plan was approved by DEHP on 10 December 2010 and fulfils the requirements of Conditions 3 to 5 of EPBC Approval 2008/4401
Dredge Management Plan - Construction Dock:
Shipping activities
-
Shipping Activity Management Plan - Operation
Shipping Activity Management Plan - Operation (Rev 2)
2008-4405 Curtis LNG SAMP Operation Approval Letter
This Shipping Activity Management Plan - Operation (Rev 2) was approved by the Department of Agriculture, Water and the Environment (DAWE) on 18 July 2020 in accordance with condition 9 of EPBC 2008/4405.
Whole of project
-
Reinstatement and Rehabilitation Manual
Reinstatement and Rehabilitation Manual
This Reinstatement and Rehabilitation Manual was approved by the Department of Environment and Energy on 9 January 2020 and satisfies Conditions 15 and 17 of EPBC 2008/4398 and Conditions 11 and 15 of EPBC 2013/7047.
-
Biosecurity Manual (former Pest and Weed Management Plan)
- Condition 15(c) of EPBC Act Approval 2008/4398 (Gas Fields);
- Conditions 3(f) and 3(g) of EPBC Act Approval 2008/4399 (Pipeline);
- Condition 30 of EPBC Act Approval 2008/4402 (LNG Plant);
- Condition 10 of EPBC Act Approval 2013/7047 (Surat Basin Acreage);
- Condition 8 of EPBC Act Approval 2018/8276 (Surat North CSG)
-
QCLNG Whole of Project Migratory Shorebird Management
QCLNG Whole of Project Migratory Shorebird Management
This Management Plan was approved by Department of the Environment (formally SEWPaC) on 26 July 2013 and fulfils the requirements of Condition 29 of EPBC Approval 2008/4399 and Conditions 18-19 of EPBC Approval 2008/4401
-
Environmental Management Plan Water Mouse (Xeromys myoides)
Environmental Management Plan Water Mouse (Xeromys myoides)
This Management Plan was approved by Department of the Environment (formally SEWPaC) on 26 July 2013 and fulfils the requirements of Conditions 8-10, 12, 29 of EPBC Approval 2008/4399, Conditions 16-17 of EPBC Approval 2008/4401 and Conditions 32-33 of EPBC Approval 2008/4402
-
Valkyrie Offset Area Management Plan
Valkyrie Offset Area Management Plan - The updated plan was approved on 30 April 2019 and fulfils the requirements of the following conditions of QGC EPBC approvals:
- Conditions 28 and 89 of EPBC 2008/4398 (Gas fields Approval);
- Conditions 17 and 41 of EPBC 2008/4399 (Pipeline Approval); and
- Condition 39 of EPBC 2013/7047 ( Surat Basin Acreage Project Approval).
-
Bellalie Offset plan and offset area management plan
Bellalie Offset plan and offset area management plan - The plan was approved on 30 April 2019 and fulfils the requirements of the following conditions of QGC EPBC approvals:
- Conditions 28 and 89 of EPBC 2008/4398 (Gas fields Approval); and
- Conditions 17 and 41 of EPBC 2008/4399 (Pipeline Approval);
Surat basin acreage
-
QGC SSMP Surat North
This management plan was approved by the Department of Agriculture Water and the Environment on 23 January 2020 and fulfils the requirements in EPBC Approvals 2013/7047 and 2018/8276.
-
Surat Basin Acreage Constraints Planning and Field Development Protocol
The revised Management Plan was approved by Department of the Environment and Energy on 4 January 2018 and fulfils the requirements of Condition 12 of EPBC Approval 2013/7047.
Surat Basin Acreage Constraints Planning and Field Development Protocol
Anya
-
Anya Significant Species Management Plans
Anya Significant Species Management Plans.- The plans were approved on 17 March 2017 and fulfil condition 4 of EPBC Approval 2015/7463.
-
Koala Offset Management Plan
The plan was approved on 13 July 2017 and fulfils condition 5 of EPBC Approval 2015/7463.
-
Constraints Planning and Field Development Protocol
Constraints Planning and Field Development Protocol
The plan was approved on 13 July 2017 and fulfils condition 3 of EPBC Approval 2015/7463 and conditions 3 to 6 of EPBC Approval 2008/4398.
More in Environment
Environment management reports
On this page you can find and download various types of reports related to QGC activities.
Water management reports
Water monitoring and management plans, water management annual reports and the Surat North Development Water Resource Monitoring and Management Plan
You may also be interested in
I am a contractor at QGC
Access to important information for contractors working on QGC sites.
QGC HSSE management system
QGC’s HSSE Management system contains the standards, procedures and tools we use to control our HSSE risks on site.
Prelude FLNG
Floating liquefied natural gas (FLNG) is a revolutionary technology that will allow Shell to access offshore gas fields that would otherwise be too costly or difficult to develop.